Center wall Phase 1
Center wall Phase 1
Center wall Phase 1
Center and back wall Phase 1
Interior View, Bales cut and placed in framing
Lime plaster application

Lime plaster application, NW Exterior

Lime plaster application, NW Exterior
Lime plaster application, South Exterior
Lime plaster application, South Exterior. Sad sad sad prep work.
Clay Floor linseed oil, dye and cure
Clay Floor linseed oil, dye and cure
Clay Floor linseed oil application
Clay Floor linseed oil application
Clay Floor linseed oil application
Clay Paint Color Test
Clay Paint Color Test 2
Clay Paint Color Test 3
Lime plaster North Wall
Lath POC, Main Bedroom
Lath POC, Main Bedroom
Straw in Frame NE Corner
Straw in Frame NW End
Straw in Frame NW Corner
Benjamin. RIP
Straw and framing looking from W to E
Lime Plaster East Gable End
Straw and framing, Great Room, looking from W from E
Approach, late summer 2022
Teamwork, teamwork, teamwork
Professionals
Sunshine on the W gable end
Rough cut lath
Biz-Caz-Mixer
Laying dow the pea gravel/clay base